Actuator Electromechanical Repair/Modification | US. Navy
Executive Summary
The U.S. Navy is procuring actuator electromechanical repair and modification services. This contract requires compliance with specific standards and is open for bidding by small businesses.
Key Requirements (Verbatim Excerpts)
- The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.
- Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint.
- Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such
- or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
- 1.1 . Markings shall be in accordance with MIL-STD-130.
- 1.4 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this
- procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer.
- 1.5 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by
- the delivery schedule of the contract.
- Replaced hardware shall be in accordance with the latest drawing revisions.The contractor shall provide and may use new or repaired/reworked parts which meet the requirements of the repair specification to restore the Government equipment in the delivery time
⚠ Important Notice Details
Submission Requirements:
- The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.
- Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint.
- Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract.
Response Deadline: June 15, 2026 8:30 PM
Need help writing a winning proposal?
Our partner network includes certified proposal writers with proven win rates across DLA, Army, Navy, and civilian agencies.
Scope & Requirements
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.
Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint.
Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such
or sent by other electronic commerce methods, such as email. The Government’s acceptance of the contractor’s proposal constitutes bilateral agreement to “issue” contractual documents as detailed herein.
1.1 . Markings shall be in accordance with MIL-STD-130.
1.4 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer.
1.5 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as required by the delivery schedule of the contract.
Replaced hardware shall be in accordance with the latest drawing revisions. The contractor shall provide and may use new or repaired/reworked parts which meet the requirements of the repair specification to restore the Government equipment in the delivery time.
Compliance & Qualifications
- Markings shall be in accordance with MIL-STD-130.
- The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited.
- Compliance with IPC/EIAJ-STD-001C is required.
How to Prepare Your Bid
- Ensure compliance with all specified standards, including MIL-STD-130 and IPC/EIAJ-STD-001C.
- Provide a clear throughput constraint for the NSNs you are bidding on.
- Prepare for final inspection and acceptance processes as outlined in the contract requirements.