FedBiz Radar
CLOSING TODAY Notice ID70FBR226R00000016 Last UpdatedSeptember 11, 2026 3:01 AM Zero-Hallucination AI · Verified

Comprehensive Facility Upgrades at Naval Weapons Station Earle | FEMA Region 2 | PSC Z2AA

★ HOMELAND SECURITY, DEPARTMENT OF FEDERAL EMERGENCY MANAGEMENT AGENCY REGION 2 New York, NY, USA
New Jersey
Combined Synopsis
September 11, 2026
New York, NY, USA
Small Business Set Aside - Total
September 14, 2026 8:00 PM
Save to My Pipeline FREE STARTER
No credit card required · 7-day Pro Trial included
FEDBIZ IQ · OBJECTIVE SOLICITATION SCANSolicitation scan complete. See if your business qualifies to win — in 60 seconds.Instant bid-fit scoring, compliance risk matrix, and go/no-go posture from solicitation details.
🎯 FedBiz IQ · Objective Solicitation Brief

Solicitation Profile & Bidding Posture

Moderate Complexity
📊 Bidding Posture
Complexity Level
Moderate
Competition Level
Medium
Required Experience
Intermediate Track Record
🏢 Target Contractor Profile
Ideal Bidder Profile
construction firms · facility upgrade specialists
Required Capabilities / Standards
construction Bonding Required Security Clearance Required
⚠️ Primary Compliance Hurdles
  • Compliance with safety and accessibility standards
  • Potential delays in material procurement
Personalized Go/No-Go Decision Does your business qualify to win this contract? Run your 60-second assessment to match your CAGE, socio-economic certs, and capacity against this solicitation.

Executive Summary

This contract opportunity is significant for small businesses specializing in facility upgrades and construction. The upgrades at Naval Weapons Station Earle will enhance safety and operational reliability, aligning with FEMA’s mission requirements. Contractors with experience in infrastructure improvements will find this project particularly suitable.

Scope of Work & Line Items

The contractor shall provide all labor, equipment, tools, materials, parts, and supplies necessary to perform the facility infrastructure upgrades at Building C-54 at Naval Weapons Station Earle in New Jersey. The scope includes:

  • Interior/exterior doors replacements and upgrades
  • Exterior cement repairs and patching of loading dock and adjacent areas
  • Sidewalk expansion of warehouse dock to building side door
  • Reinforcement and finish restoration of the designated training room wall to support future audio-visual enhancements
  • Regional Response Coordination Center (RRCC) workspace modernization to ensure safe, secure, and reliable operations in support of disaster response and ongoing FEMA mission needs

Proposal & Evaluation Rules

Responses regarding this RFP Amendment 0001 shall be directed via email to [email protected] and a copy to [email protected]. All responses must be received no later than Monday, September 14, 2026, at 4:00 pm ET.

What Contractors Should Review

  • Total small business set-aside increases chances of winning for eligible firms
  • Enhancement of FEMA facilities supports national disaster response efforts
  • Potential for follow-on work based on successful completion
🏛️
Official Procurement Documentation Verbatim SAM.gov Record & Statement of Work (SOW)
Direct SAM.gov Record Click to expand for legal verification ▾

The Federal Emergency Management Agency (FEMA) hereby issues this Request for Proposal (RFP) Amendment 0001 for Region 2 Building C-54 at Naval Weapon Station Earle in New Jersey Comprehensive Facility Upgrades. The upgrades will enhance safety, accessibility, operational reliability, and compliance with all applicable standards to support FEMA’s mission requirements.

The contractor shall provide all labor, equipment, tools, materials, parts, and supplies that are necessary to perform the facility infrastructure upgrades at Building C-54 at Naval Weapons Station Earle in New Jersey in the forms of interior / exterior doors replacements and upgrades, exterior cement repairs and patching of loading dock and adjacent areas, sidewalk expansion of warehouse dock to building side door, reinforcement and finish restoration of the designated training room wall to support future audio-visual enhancements and Regional Response Coordination Center (RRCC) workspace modernization to ensure safe, secure, and reliable operations in support of disaster response and ongoing FEMA mission needs.

RESPONSES: Responses regarding this RFP Amendment 0001 shall be directed via email to [email protected] and a copy to [email protected]. All responses must be received no later than Monday, September 14, 2026, at 4:00 pm ET.

Amendment 001: Contract Opportunity has been updated and Solicitation amended to include the following supporting documentation:

- Solicitation Amendment 70FBR226R00000016_0001

- Attachment A - Statement of Work CONSOLIDATED-Doors_RRCC_Wall_Concrete_v8_09/09/2026
- Attachment B - NWSE Building C-54 A100 Floor Plan
- Attachment C - Specifications for Doors NWSE
- Attachment D - RRCC Scale Diagram
- Attachment E - RRCC Wall and Doors Picture 1
- Attachment F - RRCC Wall and Doors Picture 2
- Attachment G - RRCC Wall and Doors Picture 3
- Attachment H - RRCC Wall and Doors Picture 4
- Attachment I - RRCC Wall and Doors Picture 5
- Attachment J - RRCC Wall and Doors Picture 6
- Attachment K - RRCC Wall and Doors Picture 7
- Attachment L - Training Room-Planar Video Wall 8x4 DLP 1.2 2K Nit
- Attachment M - Notice to Offerors-Statement of Contractors Assurance
- Attachment N - Evaluation Factors
- Attachment O - Wage Determination Davis Bacon No. NJ20260037 Mod 1 dated 05/18/2026
- Attachment P - CLIN Pricing Excel Sheet (Updated)

- Q&A: Questions and Answers updated as 09/09/2026

- Q&A: Question #16 Reference

This section contains unedited government text for verification purposes. Contractors should rely on the SAM.gov official record as authoritative.

FedBiz IQ