Environmental Sampling and Pre-Demolition Surveys by US Army Corps of Engineers
Executive Summary
The US Army Corps of Engineers is procuring environmental sampling and pre-demolition surveys for various buildings at the USMC, Twentynine Palms, California. This contract is set aside for Women-Owned Small Businesses.
FedBiz IQ
Decision Intelligence for Federal Contractors
Discover whether this opportunity deserves your bid in under 2 minutes.
Estimated completion time: ≈ 2 minutes • 5 questions • Free • No registration required
Need help writing a winning proposal?
Our partner network includes certified proposal writers with proven win rates across DLA, Army, Navy, and civilian agencies.
Scope & Requirements
The US Army Corps of Engineers, Engineering and Support Center, Redstone Arsenal, AL, has been tasked with initiating a Facility Reduction requirement at the USMC, Twentynine Palms, California. Pre-Demolition Surveys according to the requirements set forth in the Performance Work Statement (PWS) is for various buildings at the site. The objective is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCBs-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within the workdays identified in table two following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.
Compliance & Qualifications
- All sampling shall be planned and performed in accordance with Federal, State, and local regulations.
- Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion.
How to Prepare Your Bid
- Ensure your proposal clearly demonstrates compliance with Federal, State, and local regulations.
- Highlight your experience in environmental sampling and waste stream analysis in your past projects.
- Prepare to provide detailed plans for accessing all areas of the facilities, including those that may be difficult to reach.
Stop losing contracts because of avoidable mistakes.
This checklist covers the 12 critical steps government evaluators look for — and most small businesses miss.
Why Small Businesses Should Consider This
This contract presents a significant opportunity for small businesses, particularly those that are Women-Owned, as it is set aside specifically for them. The NAICS code 238910 indicates a focus on specialty trade contractors, which aligns well with small businesses that often excel in niche markets. Engaging in this contract allows small businesses to showcase their capabilities in environmental services while contributing to federal initiatives.