FedBiz Radar
EXPIRED Notice ID12639526Q0210 Last UpdatedSeptember 11, 2026 5:07 PM Zero-Hallucination AI · Verified

Fire Suppression System Installation | USDA APHIS | PSC Y1JZ, NAICS 238220

★ AGRICULTURE, DEPARTMENT OF ANIMAL AND PLANT HEALTH INSPECTION SERVICE MRPBS MINNEAPOLIS MN MINNEAPOLIS, MN, USA
Minnesota
AGRICULTURE, DEPARTMENT OF
Combined Synopsis
September 11, 2026
MINNEAPOLIS, MN, USA
Small Business Set Aside - Total
September 11, 2026 5:00 PM
Save to My Pipeline FREE STARTER
No credit card required · 7-day Pro Trial included
FEDBIZ IQ · OBJECTIVE SOLICITATION SCANSolicitation scan complete. See if your business qualifies to win — in 60 seconds.Instant bid-fit scoring, compliance risk matrix, and go/no-go posture from solicitation details.
🎯 FedBiz IQ · Objective Solicitation Brief

Solicitation Profile & Bidding Posture

Moderate Complexity
📊 Bidding Posture
Complexity Level
Moderate
Competition Level
Medium
Required Experience
Intermediate Track Record
🏢 Target Contractor Profile
Ideal Bidder Profile
Fire suppression system contractors · General contractors with specialty in retrofitting
Required Capabilities / Standards
construction Fire Suppression Systems Project Management
⚠️ Primary Compliance Hurdles
  • Compliance with federal fire safety standards
  • Integration with existing infrastructure
Personalized Go/No-Go Decision Does your business qualify to win this contract? Run your 60-second assessment to match your CAGE, socio-economic certs, and capacity against this solicitation.

Executive Summary

This contract presents a significant opportunity for contractors specializing in fire suppression systems, particularly those with experience in retrofitting existing structures. The project requires a complete design and installation of a new fire suppression system at a facility that currently lacks one, making it essential for contractors who understand federal standards and can deliver turnkey solutions. Given the urgency of fire safety, this project is a priority for the USDA.

⚠ Important Notice Details

Submission Requirements:

  • No telephone inquiries will be accepted

Response Deadline: September 11, 2026 5:00 PM

What Contractors Should Review

  • Small business set-aside increases winning chances
  • Urgent need for fire safety improvements opens doors for quick project initiation
  • Potential for future contracts if performance is satisfactory
🏛️
Official Procurement Documentation Verbatim SAM.gov Record & Statement of Work (SOW)
Direct SAM.gov Record Source reference ▾

Due to a recent fire in building 6418 at Moore Air Base, Texas, a wet fire suppression system is needed. Building 6418 was constructed in the early 1980s with no fire suppression initially.  Contractor shall provide design/as-built drawings submittals and installation of a new retrofitted system. The system shall be a turnkey project encompassing everything needed to have a fully functioning fire suppression system.

Solicitation documents are posted below.

NOTE: For those wishing to attend the site visit, please send names of attendees to james.g.roloff@usda,gov. A valid drivers license or state ID is required.

Amendment 1 is posted below.

RFI: Does Building 6418 currently have an existing fire alarm panel/system that the sprinkler monitoring would tie into? If so, could you please provide the panel/system type, make/model, or any available details needed for a sprinkler monitoring quote? The fire panels are old and obsolete. They will be replaced at another time, but the new sprinkler system must be able to connect to a fire panel in the future. No monitoring is needed.

The sign-in sheet for the site visit is posted below.

Building drawings posted below.

RFIs and responses posted below.

Amendment 2 is posted below. It extends the closing date.

Amendment 3 is posted below. It extends the closing date.

Additional RFIs and responses posted below.

Amendment 4 is posted below.

There's a change to the response to RFI 6 posted here on August 17. The correct answer is as follows:

6) Please confirm if a CVPC/PEX fire suppression would be sufficient or the USDA prefers schedule 10 or schedule 40 Victaulic black iron piping? Or provide a specification with minimum standards for Moore Airfield that must be met regarding fire suppression piping? It is typical for local building codes and state codes to be of a lesser standard than what a federal installation requires. The statement of work indicates in accordance state and local codes and standards only opening the door for a CVPC system to be priced.

The USDA prefers the use of Schedule 40 Victaulic black iron piping.

An amendment to postpone this solicitation indefinitely is posed below.

This section contains unedited government text for verification purposes. Contractors should rely on the SAM.gov official record as authoritative.

FedBiz IQ