FedBiz Radar
EXPIRED Notice IDFA8903-26-OT002 Last UpdatedSeptember 9, 2026 11:32 PM Zero-Hallucination AI · Verified

Military Working Dog Kennels Construction | Dept of Defense - Air Force

★ DEPT OF DEFENSE DEPT OF THE AIR FORCE AIR FORCE MATERIEL COMMAND AF INSTALLATION & MISSION SUPPORT CENTER FA8903 772 ESS PK
Texas
DEPT OF DEFENSE
Presolicitation
September 9, 2026
FA8903 772 ESS PK
No Set aside used
September 11, 2026 3:00 PM
Save to My Pipeline FREE STARTER
No credit card required · 7-day Pro Trial included
FEDBIZ IQ · OBJECTIVE SOLICITATION SCANSolicitation scan complete. See if your business qualifies to win — in 60 seconds.Instant bid-fit scoring, compliance risk matrix, and go/no-go posture from solicitation details.
🎯 FedBiz IQ · Objective Solicitation Brief

Solicitation Profile & Bidding Posture

Moderate Complexity
📊 Bidding Posture
Complexity Level
Moderate
Competition Level
Medium
Required Experience
Intermediate Track Record
🏢 Target Contractor Profile
Ideal Bidder Profile
Construction firms · Architectural services
Required Capabilities / Standards
construction Engineering Services Design Planning
⚠️ Primary Compliance Hurdles
  • Potential changes in project scope
  • Compliance with military construction standards
Personalized Go/No-Go Decision Does your business qualify to win this contract? Run your 60-second assessment to match your CAGE, socio-economic certs, and capacity against this solicitation.

Executive Summary

This presolicitation presents an exciting opportunity for contractors specializing in innovative construction methods. The project involves upgrading military facilities to house and train 850 dogs, providing a significant scope for contractors experienced in design and physical construction. The focus on non-traditional construction approaches opens the door for diverse solutions, making it suitable for both established firms and newer entrants to the federal contracting space.

⚠ Important Notice Details

Submission Requirements:

  • No Set aside used

Response Deadline: September 11, 2026 3:00 PM

Prior Procurement History:

  • Update released on 9 Sep 26
  • Update released on 3 Sep 26
  • Update released on 26 Aug 26
  • Amendment 1 on 24 Aug 26

What Contractors Should Review

  • Access to a significant federal contract
  • Opportunity to showcase innovative construction techniques
🏛️
Official Procurement Documentation Verbatim SAM.gov Record & Statement of Work (SOW)
Direct SAM.gov Record Source reference ▾

(9 Sep 26) Update:

This update releases revised, corrected government responses to clarify that the title page does NOT count against the Solution Brief 5-page limit. 

See attached PDF: MWDK_QnA_9Sep26_correction

(3 Sep 26) Update: 

This update releases government responses due to additional questions received. 

See attached PDF: FA8903-26-OT002_MWDK_Questions and Responses_3Sep26

(26 Aug 26) Update: 

Release of government's responses to vendor questions.

See attched PDF: MACH1_Gov_Response to questions_FA890326OT002_MWDK_26Aug26

Amendment 1 (24 Aug 26) Updates: "Presolicitation"

This MACH1_AOI opportunity is updated with the following changes: 

1. Previous Versions published as a "Special Notice" (Posting Type) were deleted & replaced with this "Presolicitation" posting

2. "Related Notice" block now reflects the associated MACH1_Parent Notice [FA8903-OT-MACH1]

3. Attached PDF was edited to remove Engineered Tensile Fabric Structures (ETF) as a mandatory material and allows for non-traditional construction methods.  The submission deadline has been extended. 

See updated Attachment PDF: MACH1_AOI_FA890326OT002_MWDK_Amend_1_24 Aug 26

Original AOI Posting (11 Aug 2026) "Special Notice"

This Area of Interest (AOI) is published under the Modernized Agile Construction Horizons (MACH1) Umbrella Program Notice. All submissions must adhere to the procedures and guidelines outlined in the parent MACH1 framework document unless otherwise tailored herein. Any resulting agreement will be an Other Transaction Agreement (OTA) executed under the statutory authority of 10 U.S.C. § 2808a.

The 772nd Enterprise Sourcing Squadron (772 ESS), in coordination with the Air Force Civil Engineer Cetner (AFCEC), is seeking an innovative commercial partner to execute this project in two distinct Lines of Effort (LOE); Design & Planning (LOE 1), Physical Construction (LOE 2) for the scope defined as follows. The Government intends to upgrade both the Joint Base San Antonio (JBSA) - Lackland West facilities and the Chapman Training Annex, beginning with the Chapman Annex. The total 341st Training Squadron requirement is to house and train 850 dogs across two sites to support the Defense Military Working Dog (MWD) Kennel Program.

This AOI seeks an innovative partner to rapidly develop a comprehensive, site-specific, and constructible design package using non-traditional construction approach built on Engineered Tensile Facilities (ETF) as the baseline structure. This initial Line of Effort (LOE 1) Design & Planning: will focus exclusively on delivering a mature design and a firm, executable plan for the full construction effort.The primary goal of LOE 1 is to produce a detailed, site-specific plan that enables a rapid and predictable approach for LOE 2: Physical Construction.

See attachment PDF: MACH1_AOI_FA890326OT002_MWDK_10 Aug 26

This section contains unedited government text for verification purposes. Contractors should rely on the SAM.gov official record as authoritative.

FedBiz IQ