FedBiz Radar
ACTIVE Notice IDN0038325QM277 Last UpdatedMay 25, 2026 6:30 AM

Outer Cylinder Repair/Modification Procurement | US. Navy | NAICS 336413

★ DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP NAVSUP WEAPON SYSTEMS SUPPORT NAVSUP WSS PHILADELPHIA
Pennsylvania
DEPT OF DEFENSE
1620
Solicitation
May 21, 2026
NAVSUP WSS PHILADELPHIA
Unrestricted
October 15, 2026 8:30 PM

Executive Summary

The U.S. Navy is procuring repair and modification services for outer cylinders. This contract is an opportunity for small businesses in the aircraft parts and equipment sector.

FedBiz IQ

Decision Intelligence for Federal Contractors

Discover whether this opportunity deserves your bid in under 2 minutes.

Estimated completion time: ≈ 2 minutes • 5 questions • Free • No registration required

Key Requirements (Verbatim Excerpts)

  • 1.1 . Markings shall be in accordance with MIL-STD-130.
  • 1.4 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this
  • procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer.
  • 1.5 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by
  • RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified
  • herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein.
  • Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the
  • RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for
  • Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material,
  • RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection
Expert Help

Need help writing a winning proposal?

Our partner network includes certified proposal writers with proven win rates across DLA, Army, Navy, and civilian agencies.

Scope & Requirements

The contractor is responsible for the following:

  • Markings shall be in accordance with MIL-STD-130.
  • The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire.
  • If MIL-STD-454 is referenced, the contractor must show compliance with IPC/EIAJ-STD-001C. Personnel performing tasks must be trained and certified as required.
  • The contractor is responsible for all inspection requirements. The contractor may use any suitable facility for inspections.
  • Purchased items shall be inspected upon receipt to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of inspections must be maintained for at least twelve months following acceptance of the end item.
  • All items must meet all requirements of this Statement of Work. Inspection requirements shall become part of the contractor’s overall inspection system or quality program.

Compliance & Qualifications

  • Compliance with MIL-STD-130
  • Compliance with IPC/EIAJ-STD-001C
  • Compliance with MIL-STD-454

How to Prepare Your Bid

  1. Ensure all materials meet the specified standards, particularly regarding wire types and inspection requirements.
  2. Maintain thorough documentation of inspection processes and results for government review.
  3. Train personnel to meet certification requirements outlined in IPC/EIAJ-STD-001C.
Free Resource

Stop losing contracts because of avoidable mistakes.

This checklist covers the 12 critical steps government evaluators look for — and most small businesses miss.

FedBiz IQ