FedBiz Radar
CLOSING SOON Notice ID12FPC326B0011 Last UpdatedMay 19, 2026 7:30 PM

Streambank Stabilization Services | USDA NRCS West Virginia | NAICS 237990

★ AGRICULTURE, DEPARTMENT OF FARM PRODUCTION AND CONSERVATION BUSINESS CENTER FPAC BUS CNTR-ACQ DIV
AGRICULTURE, DEPARTMENT OF
Y1QA – Construction of Structures & Facilities
Combined Synopsis/Solicitation
May 19, 2026
237990 – Heavy & Civil Engineering Construction
Total Small Business Set-Aside (FAR 19.5)
June 18, 2026 5:00 PM

Executive Summary

The USDA Natural Resources Conservation Service is procuring streambank stabilization services in Ohio County, West Virginia. This is a total small business set-aside contract.

Key Requirements (Verbatim Excerpts)

  • Valley Grove, WV  26060
Expert Help

Need help writing a winning proposal?

Our partner network includes certified proposal writers with proven win rates across DLA, Army, Navy, and civilian agencies.

Scope & Requirements

The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel.

Installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.

Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified.

The work consists of the mobilization and demobilization of the contractor’s forces and equipment necessary for performing the work required under the contract.

Establishing traffic control and maintaining safe, convenient use of public roads and right of way.

Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It must include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required.

Excavation required by the drawings and specifications, as well as the disposal of the excavated materials.

Construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications.

*See Specifications document attached to posting for full details of required work.

Compliance & Qualifications

  • Standard FAR clauses apply.

How to Prepare Your Bid

  1. Attend the site visit on May 28, 2026, at 10:00 AM ET at Valley Grove Community Center to gain insights into project requirements.
  2. Review the specifications document thoroughly to understand all technical requirements and deliverables.
  3. Prepare a detailed plan for mobilization and demobilization of equipment to ensure compliance with contract requirements.
Free Resource

Stop losing contracts because of avoidable mistakes.

This checklist covers the 12 critical steps government evaluators look for — and most small businesses miss.

Why Small Businesses Should Consider This

This contract is a total small business set-aside under NAICS 237990, focusing on heavy and civil engineering construction. The place of performance is in West Virginia, with a response deadline of June 18, 2026. Engaging in this project offers a chance to contribute to environmental conservation efforts.