FedBiz Radar
EXPIRED Notice IDN0010426QUB67 Last UpdatedMay 19, 2026 4:30 PM

Underwater Valve Repair Procurement | US. Navy NAVSUP WSS Mechanicsburg

★ DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP NAVSUP WEAPON SYSTEMS SUPPORT NAVSUP WSS MECHANICSBURG
Maryland
DEPT OF DEFENSE
6605
Solicitation
May 19, 2026
NAVSUP WSS MECHANICSBURG
Unrestricted
June 18, 2026 8:30 PM
FedBiz IQIs this contract right for you?Analyze the bid fit, risks, and next steps in about 60 seconds.

Executive Summary

The U.S. Navy is procuring repair services for underwater valves under a fixed-price contract. This solicitation requires the contractor's written acceptance prior to execution.

Key Requirements (Verbatim Excerpts)

  • INSPECTION OF SUPPLIES–FIXED-PRICE (AUG 1996)|2|||
  • INSPECTION AND ACCEPTANCE OF SUPPLIES | 26 | X | X |
  • Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^
  • B. General Requirements: MIL-STD Packaging, Government Source Inspection, FOB Source, CAV Reporting.
  • C. This RFQ is for REPAIR. The resultant award of this solicitation will be issued bilaterally,requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding.
  • E. Must adhere to IUID requirements of DFARS 252.211-7003
  • Repair Turnaround Time (RTAT) definition: The resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the
  • Throughput Constraint: Contractor must provide a throughput Constraint for eachNSN(s). Total assets to be repaired monthly after initial delivery commences: _____/month (contractor is to fill in #). A throughput of "0" (zero) per monthreflects no throughput
  • – Award to CAGE:________
  • – Inspection & Acceptance CAGE, if not the same as Award to CAGE: _________

⚠ Important Notice Details

Submission Requirements:

  • Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule.
  • Award to CAGE:________
  • Inspection & Acceptance CAGE, if not the same as Award to CAGE: _________

Response Deadline: June 18, 2026 8:30 PM

Expert Help

Need help writing a winning proposal?

Our partner network includes certified proposal writers with proven win rates across DLA, Army, Navy, and civilian agencies.

Scope & Requirements

This RFQ is for REPAIR. The resultant award of this solicitation will be issued bilaterally, requiring the contractor’s written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding.

General Requirements: MIL-STD Packaging, Government Source Inspection, FOB Source, CAV Reporting.

Repair Turnaround Time (RTAT) definition: The resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the.

Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences: _____/month (contractor is to fill in #). A throughput of “0” (zero) per month reflects no throughput.

Compliance & Qualifications

  • Must adhere to IUID requirements of DFARS 252.211-7003

How to Prepare Your Bid

  1. Ensure compliance with MIL-STD Packaging and Government Source Inspection requirements.
  2. Prepare to provide a throughput constraint for the repair of underwater valves.
  3. Verify nomenclature, part number, and NSN before submitting your proposal.
Free Resource

Stop losing contracts because of avoidable mistakes.

This checklist covers the 12 critical steps government evaluators look for — and most small businesses miss.

FedBiz IQ